Rig Move Report Zpec 19
Rig Move Report Zpec 19
Dear: Gents:
I would like to inform you that, Already we had completed the rig move for Zpec Rig 19 was success smoothly safely , and hold daily pre job safety meeting with all drivers before start work and informed them should be working as standard safety requirements & implement the specific safety instruction for PETRONAS and Zpec inside location ( wearing full PPE, follow speed limit during work to avoid any hazard or any accident inside location., secure loads as soon they loaded to avoid any falling down especially in mud system area , also follow lifting operation and asked them should be to give the signals and wearing the safety jacket to be more clear for crane operator, hold daily meeting with Zpec crew to build excellent communication skills , and work as one team to introduce complete service for our clients this our goals, would like to introduce many thanks for Zpec operation with us during move , and working as one team to achieving of our goals together.