Rig Move Report Zpec 19

 

Rig Move Report Zpec 19

Dear: Gents:

I would like to inform you  that, Already we  had completed the rig move for Zpec Rig 19  was success smoothly safely  , and hold daily pre job safety meeting with all drivers before start  work  and informed them should be working as standard safety  requirements  & implement the specific safety instruction for PETRONAS and Zpec inside location ( wearing full PPE, follow speed limit during work  to avoid any hazard or any accident inside location., secure loads as soon they loaded to avoid any falling down especially in mud system area , also follow lifting operation and asked them should be to give the signals and wearing the  safety jacket to be more clear for crane operator, hold daily meeting with Zpec crew to build excellent communication skills , and work as one team to introduce complete service for our clients this our goals, would like to introduce many thanks for Zpec  operation with us during move , and working as one team to achieving of our goals together.

Thanks Letters