Get Adobe Flash player

Rig Move Report for DQWO075

 

Rig Move Report for DQWO075

 

 

Dear: Gents,

 

I would like to inform you that, Already we had completed the rig move for DQWO075 from north to south Rumaila and the distance 42km, was success smoothly safely , held pre job safety meeting with all drivers  daily before start work and informed them  should be working  as standard safety requirements & implement the specific safety instruction for ROO  inside Rumaila oilfield ( Wearing full PPE , follow speed limit inside & between both of locations to avoid any hazard or any accident  , secure loads before leave the old location , and make convoy for all normal & wide loads during moving between both of locations by 2 escort  cars one in front loads  & one in the back with big warning signs  caution wide & highest loads, to be more clear for any vehicles reserve at the road , and also held pre job safety meeting for this job with drivers and explained for them what we can do exactly  & the specific instruction during convoy to be more control before leave.

Thanks Letters